Barrage-centrale de Génissiat
Open today

We
speak
English
speak
English
Bons plans
Do not miss the long canal on the right side of the bank where the water is evacuated. It ends up in an impressive drop called the "ski jump".
Présentation
Europe’s first major hydroelectric dam. The construction began in 1936 and it was finished in 1948. Things to see: the surface spillway on the right bank. This is a long channel ending with a spectacular “ski jump”.
CNR offers an interactive and educational guided tour that combines hydraulic art, history and technology. There are some movies, models and objects that will help you to discover the great adventure of the river Rhone as well as all the different renewable energies such as the water, the wind and the sun that CNR has been developping.
CNR offers an interactive and educational guided tour that combines hydraulic art, history and technology. There are some movies, models and objects that will help you to discover the great adventure of the river Rhone as well as all the different renewable energies such as the water, the wind and the sun that CNR has been developping.
Book
Video
Practical information
Opening hours
From 15/02 to 18/12/2020, daily between 10 am and 6 pm.
Prices
Reduced price: from 5 €
Adult: from 10 €
Child: from 5 €
Large family: 30 €
Group adults: from 8 €.
Group rate available for > 14 people.
Adult: from 10 €
Child: from 5 €
Large family: 30 €
Group adults: from 8 €.
Group rate available for > 14 people.